The Senior Adviser to the Head of State for Infrastructure visited roundabout Socimat, on June 30 Boulevard, to reassure the proper functioning during the construction of two reinforced concrete box culverts. This is in order to succeed at all costs two months of the contractual period bet promised by the Congolese Agency for Major Works (ACGT) to the Congolese population. Robert Mukoko is impressed with the quality of the expertise of Engineers ACGT. Building on the day of Tuesday, September 13 to conduct a working visit to get an idea about the level of progress of the work, he is reassured that by September 25 the roadway will be completely free traffic . Accompanied by the CEO of the ACGT, Medard Ilunga Mwamba, it examined the scuppers of construction work carried out by the Chinese company.
Indeed, Robert Mukoko was released very satisfied site. First, with respect to time, that the work will be completed in a few days and then compared to the quality of work. Performance is reliable, because they are the experts of the ACGT, under the supervision of DG Medard Ilunga Mwamba, who made the calculation of this site. He confessed that the Congolese Agency for Major Works is able to perform great works with an international dimension. He realized clearly that this work will end even before the deadline. To express his satisfaction, he commended the leadership of the President of the Republic paraphrased it: “If you do not believe my word, believe still in my works.” has believed, the works speak for themselves. ” This is a quality book that experts ACGT carries for 100 years. These experts have the merit of being praised by future generations. ”
The CEO of ACGT, for his part, stressed that his work for the company success. Giving details of the level of progress, he reassured that this project is taking into account all that has been set. This is exactly the delivery time will be respected. It is by virtue of that period, he added, planned for 5 months, the ACGT, with its expertise, has reduced to two months. ” We produced a reinforced concrete box culvert better, good enough and we are satisfied with what we do for the Republic ”.
It really is a beautiful book that will soon be buried. The average person does not see, because in four days, the scuppers are closed by covering the floor. Thus, to allow the flow of traffic, the ACGT opened a passage so as to help avoid congestion. And extension work continued until September 25, 2016.
The CEO of ACGT called Kinshasa population to own this book that costs roughly 2.3 million US dollars. ” This is a real important act of the heritage of the city of Kinshasa must be protected at all costs as long as possible, ” he concluded.